Our work with Zepplin UK aimed at replacing a critical part of our mixing plant during a very short period of downtime.  We were thrilled when Steve and Adam derived a project plan which reduced the amount of work which was needed from our original brief.  As ever, with a large engineering project based on equipment 25yrs old we all knew we would face a number of unforeseen challenges.

 

What we appreciated most about working with Steve and his team was their ability to cut through these challenges and deliver great solutions to keep the project on track, and in budget.  Finally, the Zepplin team were still on-site until we had successfully got the mixing plant up and running, going above and beyond their brief and ensuring the project was a success.